Installation
P410 HYBRID TRANSMISSION / TRANSAXLE: GENERATOR CABLE: INSTALLATION
1. INSTALL GENERATOR CABLE
CAUTION:
Wear insulated gloves.
(a) Install the generator cable to the hybrid transaxle assembly with the 3 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
NOTICE:
Keep the sealing surface of the generator cable and the connector terminal joint free of foreign matter.
(b) Engage the 2 claws to install a new terminal cap.
NOTICE:
When installing the terminal cap to the generator cable terminal block, keep the sealing surface free of foreign matter.
(c) Place the generator cable connector shell in position and install it with the 3 bolts.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(d) Connect the generator cable clamp to the motor cable bracket.
2. INSTALL RADIATOR PIPE
(a) Install the radiator pipe with the 2 bolts.
Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
(b) Connect the No. 3 radiator hose, No. 4 water by-pass hose and No. 1 radiator hose with the clamps.
3. INSTALL INVERTER TRAY BRACKET Installation
4. INSTALL INVERTER RESERVE TANK ASSEMBLY Installation
5. INSTALL INVERTER WITH CONVERTER ASSEMBLY
Installation
6. ADD COOLANT (for Engine) Coolant (for Engine)
7. INSPECT FOR COOLANT LEAK (for Engine) Cooling System
8. INSTALL NO. 1 ENGINE UNDER COVER