Installation
HYBRID / BATTERY CONTROL: PLUG-IN CHARGE CONTROL ECU: INSTALLATION
1. INSTALL PLUG-IN CHARGE CONTROL ECU ASSEMBLY
CAUTION:
Wear insulated gloves.
(a) Install the plug-in charge control ECU assembly with the 2 nuts.
Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)
(b) Connect the 2 connectors.
2. INSTALL HYBRID BATTERY HOSE ASSEMBLY Installation
3. INSTALL BATTERY COOLING BLOWER ASSEMBLY (for RH Side) Installation
4. INSTALL BATTERY COOLING BLOWER ASSEMBLY (for LH Side) Installation
5. INSTALL REAR DECK TRIM COVER Installation
6. INSTALL DECK TRIM SERVICE HOLE COVER Installation
7. INSTALL DECK FLOOR BOX LH
HINT
Use the same procedure described for the RH side Installation.
8. INSTALL REAR NO. 4 FLOOR BOARD SUB-ASSEMBLY Installation
9. INSTALL REAR NO. 2 FLOOR BOARD Installation
10. INSTALL SERVICE PLUG GRIP
Installation