Operation CHARM: Car repair manuals for everyone.

Installation





HYBRID / BATTERY CONTROL: PLUG-IN CHARGE CONTROL ECU: INSTALLATION

1. INSTALL PLUG-IN CHARGE CONTROL ECU ASSEMBLY

CAUTION:
Wear insulated gloves.

(a) Install the plug-in charge control ECU assembly with the 2 nuts.

Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)

(b) Connect the 2 connectors.

2. INSTALL HYBRID BATTERY HOSE ASSEMBLY Installation

3. INSTALL BATTERY COOLING BLOWER ASSEMBLY (for RH Side) Installation

4. INSTALL BATTERY COOLING BLOWER ASSEMBLY (for LH Side) Installation

5. INSTALL REAR DECK TRIM COVER Installation

6. INSTALL DECK TRIM SERVICE HOLE COVER Installation

7. INSTALL DECK FLOOR BOX LH

HINT
Use the same procedure described for the RH side Installation.

8. INSTALL REAR NO. 4 FLOOR BOARD SUB-ASSEMBLY Installation

9. INSTALL REAR NO. 2 FLOOR BOARD Installation

10. INSTALL SERVICE PLUG GRIP

Installation