Operation CHARM: Car repair manuals for everyone.

Distributor: Testing and Inspection

Distributor (IIA) Components:





IIA INSPECTION PROCEDURE
1. Disconnect IIA connectors
2. Remove distributor cap
3. Remove rotor
4. Remove ignition coil dust cover

Ignition Coil Inspection
5. Inspect primary coil resistance




Using an ohmmeter, measure the resistance between the positive (+) and negative (-) terminals.
NOTE: "Cold" and "Hot" in the following sentences express the temperature of the coils themselves. Cold Is from -10°C (14°F) to 50°C (122°F) and "Hot" is from 50° C (122°F) to 100°C (212°F).
Primary Coil resistance:
Cold: 1.11 - 1.75 Ohms
Hot: 1.41 - 2.05 Ohms

^ If the resistance is not as specified. replace the ignition coil.
6. Inspect secondary coil resistance




Using an ohmmeter, measure the resistance between positive (+) and high-tension terminals.
Secondary Coil resistance:
Cold: 9.0 - 15.7 k Ohms
Hot: 11.4 - 18.4k Ohms

^ If the resistance is not as specified. replace the ignition coil.

Distributor (IIA) Inspection
7. Inspect air gap




Using a feeler gauge. measure the air gap between the signal rotor and pick up coil projection.
Air gap: 0.2 - 0.4 mm (0.008 - 0.016 in.)
^ If the air gap is not as specified, replace the distributor housing assembly.
8. Inspect signal generator (pick up coil) resistance




Using an ohmmeter, measure the resistance between the terminals.
Pickup Coil Resistance:
Cold: G (+) and G (-): 185 - 275 Ohms
NE (+) and NE (-): 370 - 550 Ohms
Hot: G (+) and G (-): 240 - 325 Ohms
NE (+) and NE (-): 475 - 650 Ohms

^ If the resistance is not as specified, replace the distributor housing Assembly.
9. Reinstall ignition coil dust cover
10. Reinstall rotor
11. Reinstall distributor cap
12. Reconnect IIA connectors
For igniter inspection procedures, refer to Ignition System Testing
Initial Inspection and Diagnostic Overview