Valve: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Resurface/Grind | ||||
| One CYL | ||||
| Right Bank | 7.1 | 5.1 | A | |
| Left Bank | 7.8 | 5.6 | A | |
| Both Banks | 9.5 | 6.8 | A | |
| Note | ||||
| With AC, Add | 0.9 | 0.6 | A | |
| With A.I.R., Add | 0.8 | 0.5 | A | |
| With Cruise Control, Add | 0.4 | 0.2 | A | |
| With Turbo, Add | 0.4 | 0.2 | A | |
| All Cyls | ||||
| Right Bank | 8.1 | 5.8 | A | |
| Left Bank | 8.8 | 6.3 | A | |
| Both Banks | 11.3 | 8.1 | A | |
| Note | ||||
| With AC, Add | 0.9 | 0.6 | A | |
| With A.I.R., Add | 0.8 | 0.5 | A | |
| With Cruise Control, Add | 0.4 | 0.2 | A | |
| With Turbo, Add | 0.4 | 0.2 | A | |
| Add the Following Operations If Performed With Valves, Grind | ||||
| Tune-Up | 0.6 | 0.0 | A | |
| Valve Guides, Ream | ||||
| Each | 0.2 | 0.0 | A | |
| Valve Guides, Renew | ||||
| Each | 0.2 | 0.0 | A | |
| Lifters, Renew | ||||
| Right Bank | 1.9 | 0.0 | A | |
| Left Bank | 1.9 | 0.0 | A | |
| Both Banks | 2.0 | 0.0 | A | |
| Rocker Arms, Renew | ||||
| Right Bank | 1.0 | 0.0 | A | |
| Left Bank | 0.6 | 0.0 | A | |
| Both Banks | 1.4 | 0.0 | A | |
| Timing Chain, Renew | 2.0 | 0.0 | A | |
| Camshaft, Renew | ||||
| Without Turbo | 3.3 | 0.0 | A | |
| With Turbo | 4.6 | 0.0 | A |