Operation CHARM: Car repair manuals for everyone.

Generator Replacement

REMOVAL PROCEDURE

The Delphi AD237 (KG7) generator is serviced as a complete unit only.




1. Disconnect the battery negative cable.
2. Remove the drive belt.
3. Remove the engine cooling fan assembly.
4. Disconnect the wiring harness connector from the generator.
5. Reposition the protective boot from the generator output BAT terminal for access.
6. Remove the generator output BAT terminal nut and disconnect the battery positive lead from the generator.




7. Remove the drive belt idler pulley bolt and the drive belt idler pulley.
8. Remove the 2 upper generator mounting bolts.
9. Position the generator upward in order to gain access to the two upper A/C compressor mounting bolts.
10. Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle.




11. Remove the upper A/C compressor mounting bolts (1).
12. Loosen the rear A/C compressor nut (2).
13. Remove the front A/C compressor nut (3).
14. Carefully position the A/C compressor away from the engine block, in order to allow clearance to remove the generator.
15. Lower the vehicle.
16. Remove the generator from the vehicle.

INSTALLATION PROCEDURE




1. Position the generator to the engine.
2. Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle.
3. Install the A/C compressor to the front (4) and rear (5) studs on the engine block.

NOTE: Refer to Fastener Notice in Service Precautions.

4. Install and hand tighten the A/C compressor mounting bolts (1) and nuts (2, 3).

Tighten
^ Tighten the front nut (3) to 50 N.m (37 lb ft).
^ Tighten the bolts (1) to 50 N.m (37 lb ft).
^ Tighten the rear nut (2) to 25 N.m (18 lb ft).

5. Lower the vehicle.




6. Install and hand tighten the 2 upper generator mounting bolts.
7. Install the drive belt idler pulley and drive belt idler pulley bolt.

8. Tighten the bolts in the order described.

The following is a mandatory torque sequence:

8.1. Tighten
Tighten the idler pulley bolt to 50 N.m (37 lb ft).

8.2. Tighten
Tighten the generator mounting bolts to 50 N.m (37 lb ft).




9. Connect the wiring harness connector to the generator.
10. Connect the battery positive lead and install the generator output BAT terminal nut.

Tighten
Tighten the generator output BAT terminal nut to 12.5 N.m (111 lb in).

11. Press the protective boot on to the generator output BAT terminal.
12. Install the engine cooling fan assembly.
13. Install the drive belt.
14. Connect the battery negative cable.