Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL Each Side14.710.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Camshaft, Renew3.30.0A
Main Bearings, Renew1.60.0A
Oil Pump, Renew0.90.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew0.80.0A
Timing Chain, Renew1.00.0A
Tune-Up0.60.0A
Valve Lifters, Renew
Right Bank1.50.0A
Left Bank1.50.0A
Both Bank1.70.0A
One CYL10.87.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls15.711.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.80.5A
With Cruise Control, Add0.40.2A