Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Camshaft, Renew3.30.0A
Main Bearings, Renew1.60.0A
Oil Pump, Renew0.90.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew0.80.0A
Timing Chain, Renew1.00.0A
Valve Lifters, Renew
Right Bank1.50.0A
Left Bank1.50.0A
Both Bank1.70.0A
Tune-Up0.60.0A
One CYL Each Side14.810.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.80.5A
With Cruise Control, Add0.40.2A
One CYL11.17.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls16.111.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.