ABS Control Unit Power and Ground Systems
ABS Control Unit Power and Ground Systems InspectionINSPECTION PROCEDURE
1. SELF-DIAGNOSIS RESULT CHECK
Check self-diagnosis results.
Is the above displayed in the self-diagnosis item?
Yes >>GO TO 2.
No >>INSPECTION END.
2. CONNECTOR INSPECTION
1. Turn the ignition switch off and disconnect the ABS actuator and electric unit connector E125.
2. Check the terminals for deformation, disconnection, looseness or damage.
OK or NG
OK >>GO TO 3.
NG >>Repair or replace as necessary.
3. ABS CONTROL UNIT POWER AND GROUND CIRCUIT INSPECTION
1. Disconnect ABS actuator and electric unit connector E125.
2. Turn the ignition switch on.
3. Measure the voltage and continuity between the ABS actuator and electric unit connector E125 and the ground.
OK or NG
OK >>Check the battery for loose terminals, low voltage, etc. Repair as necessary.
NG >>Repair the circuit.