Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
All Connecting Rods11.88.2AIncludes: R&R Cylinder Head, Oil Pan, Plastigauge Bearings And Hone Cylinders.
Note
With Auto Trans, Add0.80.5A
To Overhaul Cylinder Head, Add
One Bank7.35.2A
With E.C.S., Add0.40.2A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew5.70.0A
Crankshaft, Renew5.70.0A
Oil Pump, Renew2.20.0A
Oil Pump Screen, Clean0.20.0A
Rocker Arms, Renew
Right Bank0.60.0A
Left Bank0.80.0A
Timing Belt, Renew1.40.0A
Camshaft, Renew
Right Bank0.60.0A
Left Bank1.50.0A
Tune-Up0.50.0A