Operation CHARM: Car repair manuals for everyone.

Summary

SUMMARY OF RECALL CAMPAIGN PROCEDURES

Following is a list of the three inspections, adjustments and replacements in this campaign. All three procedures are required:

1. Re-calibrate automatic choke by installing choke shim. The procedure is on Page 4.

2. Re-calibrate the secondary air injection system by installing an intermediate wiring harness, fill out, and affix the "EMISSION RECALL COMPLETED" label. The procedure begins on Page 9.

3. Inspect the exhaust manifold for leakage and replace it if necessary. The procedure is on Page 11.