Operation CHARM: Car repair manuals for everyone.

Secondary Control Valve Body Installation

SECONDARY CONTROL VALVE BODY INSTALLATION [FS5A-EL]

On-Vehicle Installation





1. Install the tubular pin and new O-ring to the transaxle case.





2. Install the secondary control valve body component and ground.
Tightening torque 7.8-10.8 N-m (80-110 kgf-cm, 70-95 in-lbf)
Bolt length (measured from below the head)
B: 40 mm (1.575 in)
C: 50 mm (1.967 in)





3. Match the harness colors, then connect the solenoid connector.








4. Apply a light coat of silicon sealant to the contact surfaces of the oil cover and transaxle case.
5. Install the oil cover.
Tightening torque 7.8-10.8 N-m (80-109 kgf-cm, 70-95 in-lbf)





6. Install the bracket in the figure.
Tightening torque 18-26 N-m (1.9-2.6 kgf-m, 14-19 ft-lbf)
7. Install the battery and battery tray.
8. Connect the negative battery cable.
9. Add ATF.
10. Carry out the mechanical system test. (See MECHANICAL SYSTEM TEST [FS5A-EL].) Mechanical System Test
11. Carry out the road test. (See ROAD TEST [FS5A-EL].) Road Test