Operation CHARM: Car repair manuals for everyone.

Shift Solenoid: Service and Repair

SOLENOID VALVES REMOVAL/INSTALLATION
1. Clean the transmission exterior thoroughly with a steam cleaner or cleaning solvents.
2. Disconnect the negative battery cable.
3. Drain the ATF.
4. Remove the oil pan and gasket.

CAUTION: To prevent deformation of the tube, remove the tube by pulling both ends up.





5. Remove the tubes.





6. Disconnect the shift solenoid A and B and torque converter clutch solenoid valve connector.





7. Remove the solenoid valve
8. Apply ATF to the new O-ring.
9. Install the O-ring to the torque converter clutch solenoid valve.





10. Install the new gasket and solenoid valve to the control valve body.
Tightening torque
A: 7.9 - 11.7 Nm
(80 - 120 kgf.cm, 70 - 104 inch lbs.)
B: 5.0 - 5.8 Nm (50 - 60 kgf.cm, 44 -52 inch lbs.)
11. Connect shift solenoid A, B and torque converter clutch solenoid valve connector.





12. Install the tubes.
13. Install the new gasket and oil pan.
Tightening torque
4.0 - 4.9 Nm (40 - 50 kgf.cm, 35 - 43 inch lbs.)
14. Add ATF to the specified level.
15. Carry out mechanical test. Refer to Testing and Inspection.
16. Carry out road test. Refer to Testing and Inspection.