Operation CHARM: Car repair manuals for everyone.

Test 11, Primary Circuit Continuity

Primary circuit continuity test connections:






Procedure
1. Leave straight pin in green wire as outlined in test 10.
2. Turn ignition ``On,'' then using a suitable voltmeter connected to ground measure voltage at green wire pin, Fig. 7.
3. If voltage exceeds 1.5 volts, proceed to test 13. Test 13, Ground Circuit
4. If voltage obtained is 1.5 volts or less, proceed to test 12. Test 12, Ballast Resistor