| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Resurface/Grind |
| Left Bank | 11.4 | 7.6 | A | Includes: R&R Cylinder Heads And Make All Necessary Adjustments. |
| Both Banks | 16.7 | 11.3 | A | Includes: R&R Cylinder Heads And Make All Necessary Adjustments. |
| Right Bank | 11.4 | 7.7 | A | Includes: R&R Cylinder Heads And Make All Necessary Adjustments. |
| Note |
| To Knurl Valve Guides, Add |
| Each | 0.1 | 0.0 | A | |
| To Ream Valve Guide, Add | 0.1 | 0.0 | A | |
| To Renew Timing Chain or Gears, Add |
| Right Side | 1.9 | 0.0 | A | |
| Left Side | 2.0 | 0.0 | A | |
| Both Sides | 2.0 | 0.0 | A | |
| To Renew Valve Lifters, Add | 2.3 | 0.0 | A | |
| To Renew Camshaft |
| Right Bank | 2.0 | 0.0 | A | |
| Left Bank | 2.0 | 0.0 | A | |
| Both Banks | 2.7 | 0.0 | A | |
| To Renew Valve Guides, Add |
| Each | 0.2 | 0.0 | A | |
| To Renew Rocker Arms, Add | 1.4 | 0.0 | A | |
| To Perform Tune-Up, Add | 0.9 | 0.0 | A | |