Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Connecting Rod
One Cylinder
Right Bank13.79.9AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank13.79.9AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks14.710.6AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders20.014.6AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew3.40.0A
Crankshaft, Renew6.20.0A
Oil Pump, Renew4.00.0A
Oil Pump Screen, Clean0.10.0A
Rear Main Oil Seal, Renew1.50.0A
Timing Chain, Renew
Right Bank2.10.0A
Left Bank2.20.0A
Both Banks2.20.0A
Valve Lifters, Renew2.20.0A
Camshaft, Renew
Right Bank2.10.0A
Left Bank2.30.0A
Both Banks3.00.0A
Tune-Up0.80.0A