| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Connecting Rod |
| One Cylinder |
| Right Bank | 13.7 | 9.9 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Left Bank | 13.7 | 9.9 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Both Banks | 14.7 | 10.6 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| All Cylinders | 20.0 | 14.6 | A | Includes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 3.4 | 0.0 | A | |
| Crankshaft, Renew | 6.2 | 0.0 | A | |
| Oil Pump, Renew | 4.0 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.1 | 0.0 | A | |
| Rear Main Oil Seal, Renew | 1.5 | 0.0 | A | |
| Timing Chain, Renew |
| Right Bank | 2.1 | 0.0 | A | |
| Left Bank | 2.2 | 0.0 | A | |
| Both Banks | 2.2 | 0.0 | A | |
| Valve Lifters, Renew | 2.2 | 0.0 | A | |
| Camshaft, Renew |
| Right Bank | 2.1 | 0.0 | A | |
| Left Bank | 2.3 | 0.0 | A | |
| Both Banks | 3.0 | 0.0 | A | |
| Tune-Up | 0.8 | 0.0 | A | |