Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional1.00.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
With AC, Add0.40.2A
To Replace Cylinder Heads, Add
One Bank2.71.9A
Both Banks5.33.8A
To Grind Valves, Add5.03.6A
To Renew Main Bearings, Add1.00.0A
To Renew Oil Pump, Add2.20.0A
To Clean Oil Pump Screen, Add0.20.0A
To Renew Rear Main Oil Seal, Add
Manual Transaxle1.40.0A
Auto Transaxle1.80.0A
To Perform Tune-Up, Add0.50.0A
To Renew Timing Belt, Add1.30.0A
One CYL
Front Bank10.87.8AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Rear Bank11.88.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Both Banks14.710.5AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.