Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.70.0B
Oil Pump, Renew1.30.0B
Timing Chain, Renew2.00.0B
Tune-Up0.70.0B
One CYL
Right Bank14.110.1BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank14.110.1BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks17.112.2BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
To Grind Valves, Add2.82.0B
With AC, Add
Left1.10.8B
Both1.00.7B
Each Additional0.70.4B
Note
With AC, Add
Left1.10.8B
Both1.00.7B
To Grind Valves, Add2.82.0B
All Cyls
Right Bank15.310.9B
Left Bank15.310.9B
Both Banks19.013.6B
Note
With AC, Add
Left1.10.8B
Both1.00.7B
To Grind Valves, Add2.82.0B