Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank10.87.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank9.87.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks13.79.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional0.80.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders
Right Bank12.78.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank11.88.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks16.711.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
To Renew Main Bearings, Add1.20.0A
To Renew Piston, Pin or Connecting Rod, Add
One0.20.0A
Each Additional0.10.0A
All0.70.0A
To Grind Valves, Add2.82.0A
With AC, Add0.50.3A
To Renew Crankshaft, Add
Manual Trans4.90.0A
Auto Trans4.90.0A
To Renew Oil Pump, Add0.80.0A
To Clean Oil Pump Screen, Add0.30.0A
Manual Trans2.50.0A
Auto Trans2.20.0A
To Renew Timing Chain, Add1.80.0A
To Renew Valve Lifters, Add
Right Bank1.90.0A
Left Bank1.90.0A
Both Banks2.00.0A
To Renew Camshaft, Add
Manual Trans4.40.0A
Auto Trans4.40.0A