Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Crankshaft, Renew4.20.0A
Main Bearings, Renew2.00.0A
Oil Pump, Renew1.40.0A
Oil Pump Screen, Clean0.20.0A
Tune-Up0.60.0A
Rear Main Oil Seal, Renew1.10.0A
Timing Chain or Gears, Renew2.00.0A
One Cylinder
Right Bank11.88.6AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Left Bank10.87.9AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Both Banks15.711.3AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
All Cylinders
Right Bank12.79.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Left Bank12.18.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Both Banks17.612.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Note
To Grind Valves, Add2.82.0A