Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
With Locking Wheel Covers, Add0.20.1B
With Locking Lug Nuts, Add0.20.1B
With AC, Add0.70.4B
To Grind Valves, Add2.82.0B
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.50.0B
Oil Pump, Renew1.00.0B
Timing Chain, Renew1.70.0B
Tune-Up0.60.0B
One CYL
Right Bank9.86.8BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.87.3BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks11.88.6BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank11.88.2BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank11.88.7BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks18.813.1BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.