Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank11.88.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank11.88.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks14.710.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls
Right Bank13.79.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank13.79.9AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks18.813.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.70.0A
Oil Pump, Renew1.00.0A
Oil Pump Screen, Clean0.30.0A
Rear Main Oil Seal, Renew3.00.0A
Timing Chain, Renew1.30.0A
Tune-Up0.80.0A
Crankshaft, Renew5.20.0A
Valve Lifters, Renew
Right Bank2.40.0A
Left Bank2.40.0A
Both Banks2.50.0A
Camshaft, Renew4.80.0A