Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
To Grind Valves, Add
One CYL
One Bank0.50.3A
Both Banks1.10.8A
To Replace Main Bearings, Add1.41.0A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.60.0A
Crankshaft4.90.0A
Oil Pump, Renew0.80.0A
Timing Chain or Gears, Renew1.30.0A
Tune Up0.80.0A
One CYL
Right Bank12.99.2AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Left Bank12.58.9AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Both Banks16.812.0AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
All Cyls
Right Bank15.411.0AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Left Bank15.010.7AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Both Banks21.815.6AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.
Each Additional0.90.6AIncludes: R&R Cylinder Head & Oil Pan, Remove Carbon.