Operation CHARM: Car repair manuals for everyone.

Fuel Pressure Regulator Valve, Checking







Fuel Pressure Regulator Valve, Checking

Special tools, testers and auxiliary items required

• Multimeter.

• Wiring diagram.

Test requirements

• The Engine Component Power Supply Relay (J757) OK.

• The Motronic Engine Control Module (ECM) (J623) fuses OK.

• The fuel filter OK.

• The battery voltage at least 12.5 V.

• All electrical consumers switched off (radiator fan must NOT run during test).

• A/C switched off.

• The fuel tank at least 1/4 filled.

• The ignition switched off.

Test procedure

- Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] Preliminary Check

Start diagnosis

- Remove the engine cover. Refer to the appropriate service manual.






- Disconnect the connector -1- from the Mass airflow sensor (G70) , and remove the Air Filter Housing. Refer to appropriate service manual.






Checking resistance

- Disconnect the Fuel Pressure Regulator Valve (N276) electrical harness connector - 1 -.






- Using a Multimeter, check the Fuel Pressure Regulator Valve (N276) terminals 1 to 2 for resistance.

Specified value: 25 to 35 ohms (at approx. 20° C)

If the specified value was Not obtained:

- Replace the Fuel Pressure Regulator Valve (N276). Refer to the appropriate service manual

- Go to Final procedures

If the specified value was obtained:

Checking voltage

- Switch the ignition ON.

- Using a Multimeter, check the Fuel Pressure Regulator Valve (N276) electrical harness connector terminal 1 to Ground (GND) for voltage.






Specified value: Battery voltage.

- Switch the ignition OFF.

If the specified value was Not obtained:

- Check the wiring from the Fuel Pressure Regulator Valve (N276) electrical harness connector terminal 1 to Fuse (SB 5) in Fuse Panel B for an open circuit or a short circuit to Ground (GND).

- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

- If necessary, repair the faulty wiring connection.

- Repair the circuit and replace any open fuses.

- Go to Final procedures

If the specified value was obtained:

Checking wiring connections

- Remove the Motronic Engine Control Module (ECM) (J623). Refer to appropriate service manual.

- Using a Multimeter, check the Fuel Pressure Regulator Valve (N276) electrical harness connector terminal 2 to the Engine Control Module (ECM) (J623) electrical harness connector T60 terminal 60 for resistance.











Specified value: 1.5 ohms Max.

If the specified value was Not obtained:

- Check the wiring for an open circuit, a short circuit to each other, Battery voltage or Ground (GND).

- If necessary, repair the faulty wiring connection.

- Go to Final procedures

If the specified value was obtained:

- Erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 0A

- Perform a road test to verify repair.

If the DTC does not return:

Repair complete, Generate readiness code. Refer to => [ Readiness Code ] Programming and Relearning.

- End diagnosis.

If the DTC returns and no malfunction is found in the wiring and voltage supply was OK:

- Replace the Motronic Engine Control Module (ECM) (J623). Refer to appropriate service manual.

Final procedures

- Reinstall the engine cover and air filter housing, if necessary. Refer to the appropriate service manual.

- After the repair work, the following work steps must be performed in the following sequence:

1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] Diagnostic Modes 01 - 0A.

2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Modes 01 - 0A.

3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] Programming and Relearning.