Intake Manifold - Installation
INSTALLATION
1. Apply Mopar(R) Lock & Seal Adhesive to the intake manifold bolts.
2. Install the intake manifold seals (3) and the positive crankcase ventilation (PCV) seals (1).
3. Connect the short runner valve (SRV) and the manifold air pressure (MAP) sensor (1) connectors as you position the intake manifold in place.
4. Position the intake manifold in place.
5. Using the sequence shown, tighten the intake manifold bolts to 12 Nm (9 ft. lbs.).
6. Connect the fuel supply line quick connect fitting (1) at the fuel rail (1) and install the safety retainer clip.
NOTE: The factory fuel injection wiring harness is numerically tagged (INJ 1, INJ 2, etc.) for injector position identification. If the harness was not tagged, note the wiring location previously marked before removal.
7. Connect all fuel injector electrical connectors.
8. Position the generator (2) and install the two generator mounting bolts (1, 3) and tighten to 41 Nm (30 ft. lbs.).
CAUTION: Do not let the tensioner arm snap back to the free arm position, severe damage may occur to the tensioner.
9. Insert a suitable square drive ratchet into the square hole on the belt tensioner arm (7).
10. Rotate the tensioner (7) clockwise until the accessory drive belt (4) can be installed onto the generator pulley.
11. Reposition the power distribution center (PDC) fuse block wiring harness (2) and connect the electrical connectors (1) and tighten to 12 Nm (9 ft. lbs.).
12. Connect the B+ terminal eyelet to the generator output stud and install the B+ terminal retaining nut (2) and tighten to 12 Nm (9 ft. lbs.).
13. Snap the plastic insulator cap (1) onto the B+ output terminal.
14. Connect the generator field wire electrical connector (3).
15. Connect the brake booster hose (1) and the vapor purge hose (2).
16. Connect the PCV fresh air hose (1) to the air cleaner assembly and the left side of the intake manifold.
17. Position the throttle body bracket and install the retaining bolt to the intake manifold and tighten to 4 Nm (35 in. lbs.).
18. Install the throttle body bracket retaining nut to the front cover and tighten to 18 Nm (13 ft. lbs.).
19. Position the A/C line and install the P-Clip (2).
20. Install the A/C line P-Clip retaining bolt (1) and securely tighten.
21. Connect the throttle body electrical connector (2).
22. Install the throttle body seal (1).
23. Slide the rear resonator pegs (2) into the grommets (1) on the rear of the intake manifold and lower the front of the resonator onto the throttle body.
NOTE: Verify the resonator is installed properly in the rear grommets by reaching around the left rear corner of the resonator and feeling for the pegs protruding through the rubber grommets. If the plastic pegs cannot be felt, the resonator will need to be reinstalled.
24. Install the two resonator retaining bolts (1) and tighten to 4 Nm (35 in. lbs.).
25. Connect the intake air temperature sensor (IAT) connector.
26. Install the clean air tube to the air cleaner housing and the resonator and securely tighten both clamps (2).
27. Connect the negative battery cable (1) tighten to 5 Nm (44 in. lbs.).